RELIABLE
TOP QUALITY
BEST PRICING

 

 

ClientCoca Cola HBC Armenia
Duration3 months
Completion date10/06/2024
Area200 sq.m.

Project Description

The existing loading area of the plant was also built by our company in 2017.  The Client decided to relocate and improve the loading area. We had to demolish the existing loading platform after building the new one and also reshape the roof of the warehouse.

The asphalt floors were replaced by 35cm thick reinforced concrete  to withstand 18 wheeler trucks that are being unloaded every day. We also relocated dock levelers and installed a new gate and dock shelter, metal guides and railings and  bumpers. The concrete work and installation of all the hardware required heavy duty construction with emphasis on strength and durability. We managed to complete this task and simultaneously repaired offices of Coca-Cola Company and some areas of the warehouses and parts of the exterior.