Home
About US
Our History
Why Choose Us
Contacts
Careers
Services
Concrete Structures
Metallic Structures
Exterior and Interior Fitout
HVAC
Power Supply and Lighting
Low voltage systems
Projects and references
Projects Completed
Current projects
Contacts
RELIABLE
TOP QUALITY
BEST PRICING
Home
About US
Our History
Why Choose Us
Contacts
Careers
Services
Concrete Structures
Metallic Structures
Exterior and Interior Fitout
HVAC
Power Supply and Lighting
Low voltage systems
Projects and references
Projects Completed
Current projects
Contacts
Home
About US
Our History
Why Choose Us
Contacts
Careers
Services
Concrete Structures
Metallic Structures
Exterior and Interior Fitout
HVAC
Power Supply and Lighting
Low voltage systems
Projects and references
Projects Completed
Current projects
Contacts
Portfolio Completed
Pump station building for Coca-Cola HBC Armenia
Client: Coca-Cola HBC Armenia Location: Yerevan, Armenia Completion Date: 15/05/2018
Pool terrace shade for Marriott Hotel
Metallic columns built both as structural elements and design elements. 7-10 meter columns made at our premises and installed at the hotel area.
Loading platform for Coca-Cola HBC Armenia
The platform was built in a very short time: we were just given the idea and place and did both the design and construction of the object. The client only had three weeks to complete the construction before […]
Stone facing work in the new residence of Catholicos of Armenia
We are proud to among the construction companies that worked on the residence of Catholicos of Armenia in Edjimatsin.
Concrete water reservoirs of the RIO Mall
Concrete carcass for the water reservoirs for over 500 tons of water.
1
2
3
4
5